Norhard ASNorhard in full operation with new ownersAfter a difficult period Norhard AS was terminated on the 1st of November 2020. At the end of the same month, we were back in operation...
Simen HaughomBreakthrough at RamsliLast week we completed the drilling at Ramsli. The length of the tunnel is 691 meters, drilled with a diameter of 0,7 m.
Simen HaughomDrilling at RamsliWe are currently drilling the last meters at Ramsli, here are some pictures from the ongoing project.