top of page
Search
  • Simen Haughom

Breakthrough - Gudå


Cato is happy with the breakthrough

Yesterday we completed the drilling of the pressure shaft for Gudå Kraftverk in Meråker. The pressure shaft is 550 m long and is drilled with a diameter of 1.2 m.







676 views0 comments

Recent Posts

See All
bottom of page