Another infrastructure tunnel completedNorhard ASMay 5, 20231 min readThe remotely located project without road access was completed on the 28th of April.The 1187m long tunnel for cable infrastructure was drilled for Hywer in the beautiful Lysefjord.
The remotely located project without road access was completed on the 28th of April.The 1187m long tunnel for cable infrastructure was drilled for Hywer in the beautiful Lysefjord.
Comments