After drilling through 1659m of hard rock with a drilling speed of 2-3m/h, our new ø1200mm, one cut machine saw daylight at planned inlet position.
This monumental breakthrough happened on the 21st of April. After removal of the drilling equipment a complete inspection of the tunnel was performed and the tunnel is now ready for lining.
Comments