Lining Tverrelva Power Plant

  • Writer: Norhard AS
    Norhard AS
  • Apr 14, 2019
  • 1 min read

The approximately 700m long tunnel with a diameter of 740mm was finished in full length with steel pipe Ø660mm on June 25th - 2 weeks after the start of the lining work.





 
 
 