© 2019 by Norhard AS

  • Facebook Social Ikon
  • Instagram Social Ikon
  • Linkedin Sosiale Ikon
  • Twitter Social Ikon
  • YouTube Social Ikon
Search
  • Norhard AS

Lining Tverrelva Power Plant

The approximately 700m long tunnel with a diameter of 740mm was finished in full length with steel pipe Ø660mm on June 25th - 2 weeks after the start of the lining work.





2 views