top of page
Search
  • Writer's pictureNorhard AS

Geitåni lining

Updated: Apr 26, 2019

Published 29th August 2017

The 240 m long tunnel with a diameter of 1.2 m has been fully lined with 0.91 m diameter steel pipe over its entire length. The work was carried out during the period 16 - 25 August 2017.



4 views0 comments

Recent Posts

See All
bottom of page