top of page
Logo EU no background.png
Logo EU no background.png
Search

Geitåni lining

  • Writer: Norhard AS
    Norhard AS
  • Apr 14, 2019
  • 1 min read

Updated: Apr 26, 2019

Published 29th August 2017

The 240 m long tunnel with a diameter of 1.2 m has been fully lined with 0.91 m diameter steel pipe over its entire length. The work was carried out during the period 16 - 25 August 2017.



 
 
 

Comments


bottom of page