Geitåni lining
- Norhard AS
- Apr 14, 2019
- 1 min read
Updated: Apr 26, 2019
Published 29th August 2017
The 240 m long tunnel with a diameter of 1.2 m has been fully lined with 0.91 m diameter steel pipe over its entire length. The work was carried out during the period 16 - 25 August 2017.
Comments