top of page
Search
  • Writer's pictureNorhard AS

Breakthrough Stampelva

Updated: May 19, 2021

Last week we completed the drilling at Stampelva. The length of the tunnel is 1521 meters, drilled with a diameter of 0,78 m.





128 views0 comments

Recent Posts

See All
bottom of page