top of page
Logo EU no background.png
Logo EU no background.png
Search

Breakthrough at Nottveit

Writer: Norhard ASNorhard AS

Updated: Apr 26, 2019

Published 25th May 2018

Breakthrough at Nottveit with a pilot hole diameter of 0.7 m on May 20 after drilling 460 m. This tunnel will be re-drilled to extend the pilot hole diameter to 1.2 m during the winter of 2018/2019



 
 
 

Comments


bottom of page