top of page
Logo EU no background.png
Logo EU no background.png
Search

Breakthrough Geitåni 1200mm

  • Writer: Norhard AS
    Norhard AS
  • Apr 14, 2019
  • 1 min read

On Saturday, July 15, we received a breakthrough for the tunnel at Geitåni Kraftverk at Voss. Drilling of the tunnel with a diameter of 1200 mm over a length of 240 m was carried out in two rounds. First controlled bore Ø700 mm with ND700HR machine and then up to Ø1200 mm with NR1200HR machine.





 
 
 

Comments


bottom of page