YearProjectLocationLengthElevationDiameter
2026
Skjerdal Hydropower
Aurland2605 m645 m1.2 m
2026
Kråkeelvi Hydropower
Høyanger1185 m575 m0.78 m
2025
Aa Tverrelva Hydropower
Hyen1588 m599 m0.78 m
2024
Småvoll Hydropower
Sunndal1592 m675 m1.2 m
2024
Fossdalen Hydropower
Gulen675 m243 m0.78 m
2024
Klauva Hydropower + Water Supply
Kinn/Florø306 m + 306 m144 m0.70 m + 0.78 m
2023
Kroka 2 Hydropower
Mauranger1083 m480 m0.78 m
2023
Dalåna Cable Shaft
Forsand1187 m336 m0.7 m
2023
Ervikselva Hydropower
Sunnfjord1120 m412 m1.2 m
2022
Tokheim Hydropower
Ullensvang1120 m412 m0.7 m
2022
Mordøla Hydropower

The tunnel is lined over a distance of 350 m with steel pipes with a diameter of 0.914 m.

Luster748 m348 m1.2 m
2022
Einungstøl Hydropower

Full-length lining with pipes with a diameter of 0.914 m.

Røldal410 m132 m1.2 m
2022
Mjølsvik Hydropower

Full-length lining with pipes with a diameter of 0.914 m.

Høyanger888 m246 m1.2 m
2022
Eikemo Hydropower
Vaksdal1001 m455 m0.78 m
2022
Ala Hydropower

Full-length lining with pipes with a diameter of 0.914 m.

Valdres1085 m323 m1.2 m
2022
Tverrelvi Hydropower

Full-length lining with pipes with a diameter of 0.71 m.

Voss1065 m461 m0.78 m
2021
Kvernhus Hydropower

Full-length lining with pipes with a diameter of 0.71 m.

Instefjord825 m317 m0.78 m
2021
Trollfjord Hydropower
Vågan964 m177 m0.7 m
2021
Risvoll Hydropower
Sauda800 m70 m1.2 m
2021
Kupe Hydropower
Sunnfjord827 m142 m0.78 m
2021
Stampaelva Hydropower

Full-length lining with pipes with a diameter of 0.711 m.

Jondal1521 m546 m0.78 m
2020
Bergselvi Hydropower
Fortun1091 m270 m0.78 m
2020
Kjerringnes Hydropower
Luster1483 m500 m1.2 m
2020
Ramsliåna Hydropower
Ramsli691 m197 m0.78 m
2020
Cavaglio Hydropower
Italy1600 m116 m0.78 m
2019
Gudåa Hydropower

Full-length lining with steel pipes with a diameter of 0.914 m.

Meråker550 m100 m1.2 m
2019
Nottveit Pico Hydropower

The tunnel started with a slope of 5 degrees and ended at 55 degrees.

Modalen460 m270 m1.2 m
2018
Langneset Åga Water Supply
Mo i Rana930 m + 170 m52 m0.7 m
2018
Erstmyr District Heating

Full-length lining with district heating pipes with a diameter of 0.56 m.

Tonstad575 m120 m0.7 m
2017/2018
Grytendal Hydropower(21.8 GWh)

Full-length lining with steel pipes with a diameter of 1.4 m. Equivalent to electricity for approximately 1090 households.

Bindal560 m155 m1.5 m
2017
Geitåni Hydropower(17.3 GWh)

Full-length lining with steel pipes with a diameter of 0.914 m.

Voss330 m100 m1.2 m
2017
Tenneelva Hydropower(10.3 GWh)
Vanylven485 m240 m0.74 m
2017
Steinvik Fish Farm
Freshwater transfer245 m16 m1.1 m
2016/2017
Børtveit Hydropower(10 GWh)

Full-length lining with steel pipes with a diameter of 0.66 m.

Stord1200 m270 m0.74 m
2016/2017
Hatlestad Hydropower(15.5 GWh)

The tunnel is lined over a distance of 600 m with steel pipes with a diameter of 0.61 m.

Fjærland1530 m500 m0.7 m
2016
Bjåstad Hydropower(16 GWh)

The tunnel is lined over a distance of 215 m with steel pipes with a diameter of 0.71 m.

Fjærland630 m200 m0.8 m
2016
Tverrelva Hydropower(20 GWh)

Full-length lining with steel pipes with a diameter of 0.61 m.

Kvinnherad685 m330 m0.74 m
2015/2016
Storelvi Hydropower(11.2 GWh)

Full-length lining with steel pipes with a diameter of 0.61 m.

Ullensvang745 m385 m0.7 m
2014/2016
Gjønaelva Hydropower(10 GWh)

Pre-drilled hole of 0.7 m. Reamed to a diameter of 1.2 m. Equivalent to electricity for approximately 500 households.

Fusa620 m113 m1.2 m
2014/2015
Mølleelva Hydropower(13.5 GWh)

Full-length lining with steel pipes with a diameter of 0.66 m.

Alta745 m + 875 m420 m0.74 m
2015
Selselva Hydropower(18 GWh)

Full-length lining with steel pipes with a diameter of 0.61 m. Equivalent to electricity for approximately 900 households.

Gaular975 m380 m0.7 m
2014/2015
Byro Hydropower(11 GWh)

The tunnel is lined over a distance of 400 m with steel pipes with a diameter of 0.61 m. Equivalent to electricity for approximately 750 households.

Ullensvang800 m340 m0.7 m
2014
Kaldåna Hydropower(7.4 GWh)

Lining with steel pipes with a diameter of 0.61 m.

Suldal620 m250 m0.74 m
2013
Reinåga Hydropower(12.8 GWh)

Full-length lining with steel pipes with a diameter of 0.61 m. Equivalent to electricity for approximately 320 households.

Hemnes1020 m340 m0.7 m
2013
Muoidejohka Hydropower(8.2 GWh)

The tunnel is lined over the full length with steel pipes with a diameter of 0.61 m. Equivalent to electricity for approximately 910 households.

Beiarn530 m270 m0.7 m
2012
Eitro Hydropower(10.9 GWh)

The tunnel is fully lined with Ø610 mm steel pipes. Equivalent to electricity for approximately 545 households.

Fusa730 m420 m0.7 m
2011
Kvangreelva Hydropower(5.5 GWh)

The tunnel is lined over a distance of 320 m with steel pipes with a diameter of 0.61 m. Equivalent to electricity for approximately 490 households.

Flora680 m232 m0.7 m
2010
Vågaåna Hydropower(9.3 GWh)

The lower tunnel is fully lined with steel pipes with a diameter of 0.61 m. The upper tunnel is lined over a distance of approximately 450 m at the bottom with 0.61 m steel pipes.

Vindafjord170 m + 730 m420 m0.7 m
2009
Hommafossen Hydropower(3.1 GWh)
Lund70 m + 220 m154 m0.7 m