© 2019 by Norhard AS

  • Facebook Social Ikon
  • Instagram Social Ikon
  • Linkedin Sosiale Ikon
  • Twitter Social Ikon
  • YouTube Social Ikon
Search
  • Norhard AS

Geitåni lining

Updated: Apr 26, 2019

Published 29th August 2017

The 240 m long tunnel with a diameter of 1.2 m has been fully lined with 0.91 m diameter steel pipe over its entire length. The work was carried out during the period 16 - 25 August 2017.



1 view